Hello all,
I really hope some logical bugs get fixed soon. I have 8 dumps, 6 incinerators, and 2 recycling centers throughout my city, all of which are operating fully upgraded and at full capacity. How many service buildings do I need to operate with a population of 162k?
Seems rather disproportionate that a population of an average 162k would produce 682 tn/month and the total processing of 8 dumps, 6 incinerators, and 2 recycling centers doesn't cover the output.
4 Dumps with depot, recycling center, and 2 hazardous waste centers; 2 incinerators (with 20 storage extensions, depot, and extra incinerator) at the edge of city
My dense or downtown area is not getting serviced by the 2 nearby fully upgraded dumps (depot, recycling center, and 2 hazardous waste centers), 2 incinerators (15 storage extensions, depot, and extra incinerator), and recycling center (with depot, 2 storage extensions, and 2 hazardous waste centers)
2 fully upgraded dumps (depot, recycling center, and 2 hazardous waste centers), 2 incinerators (with 15 storage extensions, depot, and extra incinerator), and a recycling center (with depot, 2 storage extensions, and 2 hazardous waste centers)
I really hope some logical bugs get fixed soon. I have 8 dumps, 6 incinerators, and 2 recycling centers throughout my city, all of which are operating fully upgraded and at full capacity. How many service buildings do I need to operate with a population of 162k?
Seems rather disproportionate that a population of an average 162k would produce 682 tn/month and the total processing of 8 dumps, 6 incinerators, and 2 recycling centers doesn't cover the output.



My dense or downtown area is not getting serviced by the 2 nearby fully upgraded dumps (depot, recycling center, and 2 hazardous waste centers), 2 incinerators (15 storage extensions, depot, and extra incinerator), and recycling center (with depot, 2 storage extensions, and 2 hazardous waste centers)

2 fully upgraded dumps (depot, recycling center, and 2 hazardous waste centers), 2 incinerators (with 15 storage extensions, depot, and extra incinerator), and a recycling center (with depot, 2 storage extensions, and 2 hazardous waste centers)

- 1
- 1