As I read from the wiki embracing an institutions is supposed to cost 2.5 ducats per development (after local autonomy), a few modifiers.
Now these numbers don't seem to add up. In my Portugal game for instance it calculates I have to pay 40.57 for Porto with 20 dev and 25 autonomy. I have -5.543% embracement cost due to 55.43 prestige.
So I calculate it should cost: 15x2.5x(1-0.0543)=35.42
If local autonomy is not considered it should be 20x2.5x(1-0.0543)=47.23
Neither numbet is what the game is saying (40.57). What factor am I missing?
I seem to be paying 2.705 ducats per development (after LA) which would be 2.86 before the prestige discount. Where does my 2.86/2.5=1.144 so 14.4% premium come from?
Now these numbers don't seem to add up. In my Portugal game for instance it calculates I have to pay 40.57 for Porto with 20 dev and 25 autonomy. I have -5.543% embracement cost due to 55.43 prestige.
So I calculate it should cost: 15x2.5x(1-0.0543)=35.42
If local autonomy is not considered it should be 20x2.5x(1-0.0543)=47.23
Neither numbet is what the game is saying (40.57). What factor am I missing?
I seem to be paying 2.705 ducats per development (after LA) which would be 2.86 before the prestige discount. Where does my 2.86/2.5=1.144 so 14.4% premium come from?