I have a 12k city with 3 landfills. They can process 335 t/month (the total of the theoretical, full capacity of the 3 landfills, one is upgraded with hazardous wastes) whereas the city is generating 385 t/month, garbage processing bar is in orange. Each landfill processing speed is about at half their capacity. I have several questions :
-How can landfills process garbage at full capacity per month yet processing speed is only half of the full capacity ? (eg they don't have enough trucks to cover the city or whatever)
-Despite overall garbage processing capacity being lower than what the city generates, garbage pileup does not seem to be happening. The whole city is in green. I built the 3rd landfill because the bar was in the red, but really it did not seem to have any impact whatsoever ? Or is it long term ?
-How can landfills process garbage at full capacity per month yet processing speed is only half of the full capacity ? (eg they don't have enough trucks to cover the city or whatever)
-Despite overall garbage processing capacity being lower than what the city generates, garbage pileup does not seem to be happening. The whole city is in green. I built the 3rd landfill because the bar was in the red, but really it did not seem to have any impact whatsoever ? Or is it long term ?