fabricating 1 air unit cost 1 manpower, but ressuplying it cost 10 manpower
fabricating 1 air unit cost 1 manpower, but ressuplying it cost 10 manpower
the ressuply cost in manpower should be proportional to build cost.
the same should apply to all units
fabricating 1 air unit cost 1 manpower, but ressuplying it cost 10 manpower
the ressuply cost in manpower should be proportional to build cost.
the same should apply to all units
Upvote
0